Municipal Building Rules

Municipal building rules for the Greater Toronto Area

A compact guide to building permits and construction supervision for house construction and renovation in Toronto, Peel, York, Durham and Halton. Find the portal, the key local rules and the contact for each of the 28 municipalities we serve.

Last reviewed November 16, 2026

Ontario rules that apply everywhere

Every municipality below enforces the same provincial framework, then adds its own by-laws.

Building Code Act and 2024 OBC

Construction, demolition, additions, material alterations and changes of use need a permit. The 2024 Ontario Building Code took effect January 1, 2025 and applies to all permit applications since April 1, 2025.

Structures with no permit

Small structures up to 10 m² are generally exempt under the Act. Several municipalities use 15 m² for sheds, and decks have their own thresholds. Always confirm locally.

Zoning, grading and trees

Many cities require zoning clearance, a grading or site alteration approval, tree permits or heritage review before the building permit is issued.

Conservation authorities

Properties near ravines, creeks, wetlands or shorelines may need TRCA, CVC, CLOCA, LSRCA or Niagara Escarpment approval first.

Additional residential units

Ontario allows up to three units on most serviced urban lots as of right. A permit is still required, and most municipalities add registration, fire and ESA steps.

Inspections and penalties

Inspections happen at set stages and the Electrical Safety Authority inspects electrical work. Work without a permit can lead to stop-work orders, removal and prosecution.

City of Toronto

Single-tier municipality

Toronto

Single-tier city

  • Permits are issued by Toronto Building. Applications are made online.
  • Zoning By-law 569-2013 applies to every project.
  • A building permit does not authorize tree removal. Private tree rules (Municipal Code Ch. 813) and ravine protection (Ch. 658) apply, with changes effective September 1, 2026.
  • Garden suites, laneway suites and residential demolition each have their own approvals.

Official permit page

Peel Region

Brampton, Caledon, Mississauga

Brampton

City

  • Apply through the Brampton Building and Business Portal.
  • Mature Neighbourhood Requirements may limit size and height of new builds and additions.
  • Conservation authority approval is needed on regulated lands.
  • Second and third units follow a separate registration and permit path.
905-874-2401 | [email protected]

Official permit page

Caledon

Town

  • Applications go through the Construction Companion portal.
  • Small-scale residential can use the Housing Design Catalogue for faster review (about 15 business days).
  • TRCA, CVC, Niagara Escarpment, Oak Ridges Moraine and source water approvals may apply.
905-584-2272 ext. 2233 | [email protected]

Official permit page

Mississauga

City

  • Apply online through ePlans.
  • Residential review targets 10 business days, second units 15.
  • Second units must be registered with the City.
  • Rental Repairs and Renovations Licensing By-law applies from September 1, 2026.

Official permit page

York Region

Nine local municipalities

Aurora

Town

  • Online permit portal.
  • Secondary and third unit registration under By-law 6660-24, with an ESA inspection.
  • Heritage permit needed for Part IV and Part V designated properties.
365-500-2081

Official permit page

East Gwillimbury

Town

  • Apply through the CityView portal.
  • Accessory apartments also need a Fire Department review.
  • Building By-law 2019-058.

Official permit page

Georgina

Town

  • Online portal. Building Bylaw 2026-0058.
  • Up to two additional residential units, one of them detached.
  • Sheds over 15 m² need a permit. Decks over 10 m², attached decks, or decks 2 ft above grade need a permit.
905-476-4301 ext. 3007 | [email protected]

Official permit page

King

Township

  • A Zoning Certificate is required before the building permit.
  • Grading review and the CityView portal apply.
  • New application form effective February 16, 2026. Book inspections online.

Official permit page

Markham

City

  • Apply through the ePlan portal.
  • Residential Infill Grading and Servicing (RGS) approval comes before the building permit.
  • Zoning By-law 2024-19 and Building By-law 2024-206. ARUs register with Markham Fire.

Official permit page

Newmarket

Town

  • Online Development Portal.
  • Structures over 10 m², and decks over 10 m² or 600 mm above grade, need a permit.
  • Additional residential units must be registered.
905-953-5300 ext. 2400 | [email protected]

Official permit page

Richmond Hill

City

  • Online applications. Building By-law 19-24.
  • Pre-approvals may be needed: site alteration grading, TRCA and planning.
  • ARU By-law 143-24 allows up to three units and offers pre-approved detached ARU plans. Heritage review for listed properties.
905-771-8810 | [email protected]

Official permit page

Vaughan

City

  • Apply through the ePlans portal. Building By-law 051-2026.
  • A Development Engineering Grading Permit comes before the building permit for larger additions, new structures and walkouts.
905-832-8510

Official permit page

Whitchurch-Stouffville

Town

  • Application and Permit Portal.
  • Decks and porches over 600 mm need a permit.
  • Second suites must be at least 37 m². Fast Track program ran May 11 to July 17, 2026.

Official permit page

Durham Region

Eight local municipalities

Ajax

Town

  • Residential permits go through the Online Application Portal.
905-619-2529 ext. 3653 | [email protected]

Official permit page

Brock

Township

  • Apply through Cloudpermit. All applications use the 2024 OBC since April 1, 2025.
  • An Applicable Law Checklist is required with every application.
  • Septic systems near Lake Simcoe are inspected every 5 years. ESA handles electrical inspections.
705-432-2355

Official permit page

Clarington

Municipality

  • Apply through the Service Clarington portal.
  • Decks over 10 m² or 0.6 m above grade need a permit.
  • Additional dwelling units have their own guide.
905-623-3379 ext. 2660 | [email protected]

Official permit page

Oshawa

City

  • Fees increased 3% on January 1, 2026.
  • An Applicable Law form is required.
  • Review times are not guaranteed, so apply early.

Official permit page

Pickering

City

  • Paperless online portal. Building By-law 8057/23.
  • Up to two ADUs, with pre-approved designs shared with Whitby.
  • Structures over 10 m² need a permit.
905-420-4617

Official permit page

Scugog

Township

  • Apply through Cloudpermit. Building By-law 18-24.
  • Structures over 15 m² need a permit.
  • ADU registration by-law with a $50 fee and a 6 month grace period.
905-985-7346 ext. 169

Official permit page

Uxbridge

Township

  • Apply through Cloudpermit.
  • Request inspections before noon for next day booking.
  • Pergolas and gazebos over 15 m² need a permit.
905-852-9181 ext. 403 | [email protected]

Official permit page

Whitby

Town

  • Apply through the E-Portal.
  • ADU registration By-law 8156-25, up to two ADUs, with an incentive until December 31, 2026.
  • Decks over 24 inches above grade need a permit. CLOCA permit where applicable.

Official permit page

Halton Region

Burlington, Halton Hills, Milton, Oakville

Burlington

City

  • Pre-Building Approval comes first: Zoning Clearance, Grading and Drainage Clearance and a Tree Permit.
  • Building Permit By-law 30-2026. Applications by email.
  • Permits are needed for ARUs in accessory buildings.
905-335-7731 | [email protected]

Official permit page

Halton Hills

Town

  • Electronic-only applications.
  • Structures over 10 m² or sheds over 15 m² need a permit.
  • Up to two ARUs under OPA 58, effective December 9, 2024.
905-873-2600 ext. 2300

Official permit page

Milton

Town

  • Apply online.
  • Finishing a basement needs a permit.
  • ARU pilot program launched in 2025, with rural ARUs from January 2026.

Official permit page

Oakville

Town

  • Apply through ePlan. Minimum fee $200.
  • Buildings over 10 m², or any size with plumbing, need a permit.
  • Attached decks over 0.61 m need a permit. A separate DENG permit may apply.

Official permit page

Please note. This summary is compiled from each municipality’s public website and changes often. It is general information, not legal advice. Always confirm requirements, fees and timelines with your municipal building department before you start work.

Not sure what your project needs?

We handle permit drawings, applications and inspections as part of every Afif Design and Build project.

Request a free consultationCall (647) 632-4070