The timeline in plain terms
A three-month grace period ran until March 31, 2025 for designs that were already substantially complete before the new code took effect. Since April 1, 2025, every building permit application must use the 2024 code. In practice, any renovation permit you apply for now is checked against the new requirements.

Changes homeowners are most likely to notice
Municipal summaries of the Part 9 changes point to several items that touch ordinary renovations. These include new rules for openings in guards, protection for openable windows that sit high above the ground, a pipe rough-in for radon control, updated carbon monoxide alarm requirements and new rules for outdoor air intake and exhaust openings. This is not a complete list, so always check the details for your project.
Second suites and basement units
Requirements for second suites and multiplex conversions, including ceiling heights, fire separation and shared air systems, were also updated. If you are planning a basement apartment or an in-law suite, ask for the design to be checked against the 2024 code before drawings are submitted.
What to do before you renovate
Ask your contractor which code edition the drawings follow, make sure permits and inspections are part of the written scope, and confirm unusual details with the Building Division. A design-build team that manages permits and inspections keeps these checks inside one schedule instead of leaving them to chance.
This article is general information, not legal advice. Confirm requirements for your property with your local building department.