What the 2024 Ontario Building Code means for your renovation

The 2024 Ontario Building Code came into effect on January 1, 2025, and it is the largest update in years. The Home Construction Regulatory Authority reports more than 1,700 revised items, so a renovation planned today is reviewed against different rules than one planned a few years ago. Here is what the 2024 Ontario Building Code means for homeowners in Richmond Hill and across York Region.

Nov 16, 202610+ Years of experienceFree consultation
Custom home exterior by Afif Design & Build

The timeline in plain terms

A three-month grace period ran until March 31, 2025 for designs that were already substantially complete before the new code took effect. Since April 1, 2025, every building permit application must use the 2024 code. In practice, any renovation permit you apply for now is checked against the new requirements.

Custom home exterior built by Afif Design & Build in Richmond Hill

Changes homeowners are most likely to notice

Municipal summaries of the Part 9 changes point to several items that touch ordinary renovations. These include new rules for openings in guards, protection for openable windows that sit high above the ground, a pipe rough-in for radon control, updated carbon monoxide alarm requirements and new rules for outdoor air intake and exhaust openings. This is not a complete list, so always check the details for your project.

Second suites and basement units

Requirements for second suites and multiplex conversions, including ceiling heights, fire separation and shared air systems, were also updated. If you are planning a basement apartment or an in-law suite, ask for the design to be checked against the 2024 code before drawings are submitted.

What to do before you renovate

Ask your contractor which code edition the drawings follow, make sure permits and inspections are part of the written scope, and confirm unusual details with the Building Division. A design-build team that manages permits and inspections keeps these checks inside one schedule instead of leaving them to chance.

This article is general information, not legal advice. Confirm requirements for your property with your local building department.

Planning a renovation? Talk to our team about permits and code requirements.

Get a free estimate

Sources

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top