1. Demolition and protection
Everything starts with careful demolition and protection of the rest of the home. Walls that will move, floors that will change and services that must be shut off are confirmed before the first cut.
2. Framing and structural changes
Any wall changes, openings or beam work happen next, because everything that follows depends on the final shape of the room.

3. Plumbing, electrical and ventilation rough-in
With walls open, plumbers, electricians and HVAC trades run supply lines, drains, wiring and exhaust ducts to their final positions. This is also when inspections are normally booked, before anything is covered.
4. Insulation, drywall and plastering
Once rough-in is approved, walls are insulated, closed, taped and sanded. A flat, clean surface here makes every later finish look better.
5. Flooring and tile
Floors and backsplash tile go in before or after cabinets depending on the design, but the layout lines are set early with a laser so cabinet runs and tile courses meet cleanly.
6. Cabinetry, countertops and millwork
Cabinets are installed level and plumb, countertops are templated from the real cabinets, and trim is added last so every edge is tidy.
7. Fixtures, painting and final inspection
Sinks, faucets, appliances and lighting are connected, walls are painted, and a final walk-through lists any touch-ups. The last inspection closes the permit.
A single design-build team that coordinates every trade keeps this sequence tight, so each crew arrives when the previous work is ready and approved.